PROSAT Projects Completed
Solar panel installation.
Installation of a photovoltaic panel system on a corporate administration building, featuring thirty 650 W solar panels (19,500 W total) that generate 97,500 Wh per day. In this instance, we were not contracted to waterproof the entire roof; only waterproof mounting bases were constructed.
Installation of inverters and smart batteries.
Installation of a system at a company's investment division comprising five high-frequency 10 kW inverters (50 kW total) in parallel and a backup array of six 16 kW smart batteries (96 kW total), complete with a main electrical panel and enclosures for AC and DC breakers and protection devices. The system is equipped with 90 solar panels rated at 650 W (58,500 W total), generating 292,500 Wh per day..
Roof waterproofing with CUBRELOTODO (black)
Roof waterproofed with CUBRELOTODO (white), with structures ready for the installation of 8 solar panels.